After-sales Service: | 1year |
---|---|
Warranty: | 1year |
Power Source: | Diesel |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The photovoltaic piling machine uses vibratory pile driving to drive and pull out piles. It is especially suitable for short and medium pile projects such as municipal, bridge, cofferdam, and building foundations, as well as river berms, railway foundation pit support, elevated foundation pit support or bridge pier foundations. Pit support and other works.
The photovoltaic pile driver uses its high frequency vibration to vibrate the pile body at a high speed, and transmit the vertical vibration generated by the machine to the pile body, resulting in the change of the soil structure around the pile due to the vibration, and the strength is reduced.
The soil around the pile body is liquefied to reduce the frictional resistance between the pile side and the soil body, and then the pile is sunk into the soil by the down pressure of the excavator, the solar photovoltaic pile driver and the self-weight of the pile body. When pulling out the pile, with one side vibrating, pull up the pile with the lifting force of the excavator. The excitation force required by the solar photovoltaic pile driver should be comprehensively determined according to the soil layer, soil quality, moisture content of the site, and the type and structure of the pile.
Overall size
|
4700*2100*2800mm
|
Track shoe width
|
400mm
|
Weight
|
6.5T
|
Travel speed
|
15° left and right
|
Drilling depth
|
0-6m (can installlonger drill pipes)
|
Drilling diameter
|
80-400mm
|
Mainstream pump
|
Triple pump
|
Reducer torque
|
13000N.m
|
Drill pipe speed
|
180r/min
|
Oil pump
|
40/40/32
|
Sliding frame pitch angle
|
120°
|
Climbing angle
|
30°
|
The hardness of rocks
|
6-20F
|
Walking speed
|
0-3km/h
|
Q1: Are you factory or trade company?
A1: We are factory. And we have ourselves trading company.